Azure Power Bags 260 MW Solar Project in Gujarat
2017-09-29
Recently, Gujarat Urja Vikas Nigam (GUVNL) had conducted an auction with an allocation capacity of 500 MW. Azure Power has been selected to build about 52% of the total allocated capacity. Azure Power had submitted a bidding of INR2.67 ($0.04) per kWh, which is claimed to be the lowest biddingContinue Reading